BC Hydro Site C Clean Energy Project

generate about 35 per cent of the energy produced at W.A.C. Bennett Dam, with only five per cent of the reservoir area. Construction on Site C began in July, 2015. The project is about 80 per cent complete and remains on-track to have all six generating units in-service by 2025, Greg Alexis, Manager of Public Affairs & Community Relations, Site C, tells Business Elite Canada. “In July, 2023, we announced the completion of the earthfill dam,” says Alexis. “The earthfill dam stands about 60 metres tall (the height of a 20-storey building), stretches more than one kilometre across the Peace River and is about 500 metres wide at its base. In total, about 16 million cubic metres of earthfill material was placed, enough to fill the Great Pyramid of Giza six times.” The completion of the earthfill dam is one of the essential milestones required before BC Hydro can begin filling the Site C reservoir. “While we are aiming to begin filling the reservoir later this fall, there are still a number of key areas that need to be completed first: approach channel, spillways, tailrace The dam at its completed height. 22 storeys high or 60 metres above bedrock. 4

RkJQdWJsaXNoZXIy MTE4MTQ=