Noble Construction

ELECTRICAL SWITCHGEAR AND DISTRIBUTION Noble has a large electrical division with experience in low medium and high voltage applications— having installed various underground substations at multiple mine sites in southeastern Saskatchewan. Trained professionals specialize in the installation of underground substations and distribution systems ranging from 5Kv to 25Kv. “We have Installations included the pre planning and review of electrical plans with engineering and plans submittals to ensure smooth installation and energization of the completed systems,” says Roberts. “The placement of permanent switch gear or portable mine power centers. Cable management systems for high voltage mine power feeder, terminations, and splices of all cabling. Grounding and bonding of cabling and equipment as well as the installed and connection of all protection devices. Our team also completes inhouse cable testing with very low frequency (VLF) test equipment prior to energization. All associated 600v, 120v and control cabling is installed to provide our clients a turnkey electrical solution.” MINING PROGRAM Noble Construction Corp. has added a fleet of underground mining equipment to provide another service in the mining sector. The fleet is built around a Joy 12cm12 Drum Miner, accompanied by a new power sled, a Stamler, scoop tram ore haulers, Arva crane with cutting head, and multiple underground personnel carriers and trucks. With this addition of equipment Noble offers underground mining Welding Pipe Underground Surge Bin and Conveyor 9

RkJQdWJsaXNoZXIy MTE4MTQ=