Overview of head end of West End Wastewater Treatment Plant. New Headworks Building A is in foreground with air handler and odour control fans and stack. Existing Main Pump Station is at upper left with two new 750 kW diesel generators. Existing Administration and Dewatering Building is at upper right with new Waste Activated Sludge Storage Tank and odour control fans and stacks. Existing Main Pump Station with two new 750 kW diesel generators inside a security enclosure. Power distribution equipment for the entire facility was upgraded inside this building. 84 APR 2023 | BUSINESS ELITE CANADA