BEC / DEC / 2024

25 DEC 2024 | BUSINESS ELITE CANADA The spillway structure has a passive spillway (at left), three upper-level outlet gates, and six lower-level outlet gates. In the early stages of reservoir filling, water will flow through four of the lower-level outlet gates. (Photo credit- BC Hydro Site C Clean Energy Project)

RkJQdWJsaXNoZXIy MTE4MTQ=