Page 8 - G. E. Booth Wastewater Treatment Plant
P. 8
MALFAR AD PROOF
fertilizer or another beneficial option,” says Glass.
“Within our EA goals we are hoping to get 50 per
cent of our biosolid for a land application reuse.” Plumbing
Process Piping
The G.E. Booth WWTP planning was done in HVAC
accordance to best practises. Typically, things Fire Protection
Systems
like cogeneration power reduction or chemical
Refrigeration
reduction are top of mind for engineers. Glass Site Services
says this project looked more into long-term land AREAS OF WORK:
New Construction
planning. Design/Build
Additions & Renovations
SPECIALIZING IN:
Water Treatment Plants
“The G. E. Booth site, is 95 per cent built out and Pumping Stations
Multi-Story Condominium
Buildings
the landmass is irregular, - (and two conservation Schools
Long-Term Care Centres
areas overlapping), so it’s a congested space,” Hotels
says Glass. “We ended up altering the way we Malfar Mechanical Inc.
Since 1988 Frank Micoli, President
144 Woodstream Blvd., Woodbridge, ON L4L 7Y3
T: 905-850-1242 F: 905-850-2630
did the masterplan. We considered within the info@malfar.ca
8 9