Digester Tank Construction                                                                          Digester Tank Complete


















































                                                                                                   Biotrickling Filter Complete

 Mike Sadowski, Wastewater Plant Manager.  plant is now able to capture the biogas produced   benefit from the upgrades of this project as this   commissioning the actual system that was installed

 from the digester tanks and turn it into a renewable   project ensures that the City of Saskatoon can   while still operating and maintaining the other areas

 The primary objective of the project was to address   energy source where it can be run through the plant   continue to maintain wastewater processing   of the plant. Other major groups to thank include
 the capacity concerns associated with the digester   boiler system instead of using natural gas,” says   standards that protect our environment,” says   the City project team, the construction contractor

 process area. Adding a fourth digester tank provided   Lacny.  Kelsea Doll, Project Manager. “With the ability to   team from Graham Construction, and the design

 the plant additional capacity and because the   utilize biogas for heating, this project has also   consultant team from Jacobs.”
 digester process area is linked to the plant heating   Finally, the project upgraded the existing biogas   reduced the City’s overall natural gas consumption.”

 system, there was a great opportunity to improve   flare system to now include two enclosed flare   With the addition of a fourth digester tank, it is

 the heating system for the entire plant.  stacks which allows for excess biogas to be   “The City of Saskatoon Wastewater Treatment   anticipated that the Wastewater Treatment Plant will
 efficiently flared off to the atmosphere.  Plant staff were very supportive throughout the   not require a digester capacity increase for another

 The project also addressed the concern surrounding   entire project,” Doll adds. “Staff participated in   30 years though this projection is dependent
 the excess biogas that was already being produced   “With this being the only wastewater treatment   performing design reviews, accommodating the   on population growth and operating permit

 at the plant. “After completing this upgrade, the   plant for the City of Saskatoon, all citizens will   contractor on the plant site during construction, and   requirements set out by the WSA.