Page 4 - Edmonton’s Valley Line Southeast LRT
P. 4

Millbourne Woodvale Stop + LRV on tracks






































                                                                                                                                                   Chris Gentile (Valley Line Technical Manager, LRT Projects, Integrated Infrastructure Services) & Quinn Nicholson
                                                                                                                                                                         (Discipline Lead for Communications and Public Relations)


                                                                Gentile explains that the Valley Line LRT is built on              The LRT line is being built in multiple stages, with
                                                                an entirely new principle—an urban-style LRT. This                 this Southeast stage being built first due to the fact

                                                                means it has more frequent stops and smaller-scale                 that the Valley Line will need its own maintenance

                                                                stops. “The trains run basically at community (traffic)            facility, says Quinn Nicholson, Discipline Lead for
                                                                speeds and orient towards moving people from stop                  Communications and Public Relations. “This stage

                                                                to stop within the network, not outside the network.”              will have 11 street-level stops, a new bridge spanning

                                                                                                                                   the North Saskatchewan River, and an interchange
  LRV moving through intersection                               Given this philosophy, Edmonton will use the                       linking to the Capital Line and Metro Line.”
  66 St and 34 Ave
                                                                transportation network as a way of building up

                                                                and densifying the city to prepare Edmonton for                    An LRT is kind of a Goldilocks happy medium
                                                                an eventual population of 2 million people. “It goes               scenario in terms of building cost and ridership,

                                                                hand-in-hand with a changing view of what the                      says Nicholson. “Cities get the slightly lower
                                                                city was going to be and how it would function                     capital cost compared to an underground metro,

                                                                and that's the critical importance of the line,”                   but you get a higher frequency of usage and lower

                                                                says Gentile. “These criteria put greater value on                 maintenance and operations costs than you would
                                                                community environments than had been used                          with bus rapid transit.”

                                                                before.”


    4                                                                                                                                                                                                                                            5
   1   2   3   4   5   6   7   8   9