Page 40 - BEC / OCT / 2022
P. 40
The Valley Line Southeast
will run 13 km from
Downtown to Mill Woods,
and will feature:
• 11 street-level stops
• An elevated station with Tawatinâ Bridge Community Led Grand Opening Celebration December 2021.
a 1,300-spot Park & Ride
facility and a full transit
centre located in the Wagner
industrial area
• The new Tawatinâ Bridge
across North Saskatchewan
River
• A short tunnel from the
north face of the River Valley
Gerry Wright Operations and Maintenance Facility
through to the Quarters
redevelopment
• An interchange point at
Churchill Square to access
the existing Capital Line and
Metro Line
Valley Line West groundbreaking ceremony, May 27, 2022, at Lewis Farms.
40 OCT 2022 | BUSINESS ELITE CANADA