Page 40 - BEC / OCT / 2022
P. 40

The Valley Line Southeast

         will run 13 km from
         Downtown to Mill Woods,

         and will feature:



         • 11 street-level stops



         • An elevated station with                            Tawatinâ Bridge Community Led Grand Opening Celebration December 2021.

         a 1,300-spot Park & Ride

         facility and a full transit
         centre located in the Wagner

         industrial area



         • The new Tawatinâ Bridge

         across North Saskatchewan

         River



         • A short tunnel from the
         north face of the River Valley
                                                 Gerry Wright Operations and Maintenance Facility
         through to the Quarters

         redevelopment



         • An interchange point at
         Churchill Square to access

         the existing Capital Line and

         Metro Line











                                                                               Valley Line West groundbreaking ceremony, May 27, 2022, at Lewis Farms.



     40  OCT 2022  |  BUSINESS ELITE CANADA
   35   36   37   38   39   40   41   42   43   44   45