Page 4 - Sprung Structures
P. 4

Within days of announcing the $2-million structure
                                                                in Burlington, Ontario, pieces began arriving from

                                                                Sprung's Calgary facility, and immediately began
                                                                being put together by BLT Construction and a

                                                                team of subcontractors. The aluminum structure

                                                                combined with tensioned membrane panels is an
                                                                ideal solution for quick-build hospitals. It is based

                                                                on "swooping" aluminum supports and are wrapped

                                                                with a thick material. Inside these structures,
        all hospitals implement pandemic plans to help          medical teams are provided with everything from
        increase capacity as cases of COVID-19 continue to      working intensive care units to medical overflow

        grow. Upon that advice, Joseph Brant Hospital set       facilities,  triage units, isolation zones, and testing

        out to build a temporary pandemic response unit to      facilities. The interior grade medical units are
        expand the hospital’s bed capacity in preparation       literally constructed in days from pre-manufactured

        for the anticipated surge of COVID-19 patients on       walls systems that literally snap into position within

        March 30.                                               minutes.


    4                                                                                                                                                                                                                                            5
   1   2   3   4   5   6   7   8