Page 4 - TransAqua WWTP Project
P. 4

Centrifuges





































                                                                                                                           Rotary Drum Thickeners - Sludge Handling Facility





        The workers will be upgrading the chemically            redundancy and equipment, so preventive work and
        enhanced primary treatment process to a secondary       maintenance can be carried out while equipment is

        biological level wastewater treatment system that       taken down.

        can serve a growing population.
                                                                PHASES OUTLINE PROJECT

                                                                MILESTONES
        “We currently service 118,000 citizens, with an
        average daily flow of 71,000 cubic metres,” Rice

        says. “Because our communities are growing —            TransAqua, the Greater Moncton Wastewater

        the city of Dieppe was one of the fastest growing       Commission, was established in 1983 to support
        communities in Canada the last few years — our          the wastewater collection and treatment needs

        upgrade design is factoring in 147,000 citizens, with   of Dieppe, Moncton and Riverview. It has also
        an average daily flow of 90,000 cubic metres.”          become a leader in the reuse of biosolids through

                                                                the generation of type “AA” compost (the highest

        Other factors include allowances to meet future         grade currently achieved in Canada) as opposed to
        combined sewer overflow treatment guidelines, and       disposal in a landfill site.






    4                                                                                                                                                                                                                                            5
   1   2   3   4   5   6   7   8   9